(General maintenance, new lines.)
On most rail projects that MJM have been involved in, the material is felled by chainsaw, and then lifted by excavator or hand to a clean area for mulching. The resulting material can then be left on site, raked up and removed, or incorporated in to the top soil.
On new rail projects, the material can be simply felled, win rowed and mulched. Resulting material can either be incorporated into the top soil or raked up and removed.
|